SA214 Electric-Resistance-Welded Carbon Steel Heat-Exchanger and Condenser Tubes

SA214 Electric-Resistance-Welded Carbon Steel Heat-Exchanger and Condenser Tubes

Model No.︰HC2009113001

Brand Name︰HC

Country of Origin︰China

Unit Price︰US $ 100 / pc

Minimum Order︰1000 pc

Inquire Now

Product Description

Standard Name: ASME SA214  Electric-Resistance-Welded Carbon Steel Heat-Exchanger and Condenser Tubes

Specification:

1) Size: OD > 20 mm & THK > 0.5 mm ;

2) Tight tolerance, Smooth surface, Uniform mechanical property(Mechanical Properties equilibrium) ;

3) Heat treatment:  GBK, NBK,Stress Relief, Normalizing, Spheroidize Anneal, Annealing, Bright Annealing, Normalized, Quenched and Tempered, Solution Annealing, etc ;

4) Steel Grade: ASTM A214, ASME SA214;

5) Rust prevention treatment, such as: immersion oil, lacquer, passivation, phosphating,etc;

6) Plastic plugs or caps on both ends as required ;

7) Packaging: Hexagonal bundles of max. 1,500kg with several steel strips, Wrapped in waterproof paper, PVC sleeve,and sackcloth with several steel strips or packed in heavy tri-wall boxes, wooden boxes, wooden slats as requires;Type: Round , Square, Rectangle, Hexagon. Streamline, etc;

8) Relevant Test: Chemical Component Analysis,Mechanical Properties(Ultimate tensile strength,Yield strength,Elongation),Technics Properties(Flattening Test,Flaring Test,Bending Test,Hardness Test,Blow Test,etc), Exterior Size Inspection, Nondestructive Test,Hydrostatic Test;

9) Main Applications: Boiler and Heat Exchanger, etc.
 

Mobile: +86 138 128 775 59 -->Terry
Email : terry-tube at hotmail.com

Commercial Information:
  1) Delivery                    :  Within 45 days ready at mill ;
  2) Min Order                 :  25 Ton Per Item Tube;
  3) Packing way              :  As per our export standard for shipment ;
  4) Term of payment       :  30% T/T within 3 days after signing the contract, balance 70% before shipment. Or 30%T/T +70% irrepealable L/C ;
  5) Delivery Port              :  Shanghai Port ;
  6) Offer Validity              :  5-7 Days        ;
  7) Container                   :  20' or 40', etc ;
  8) Manufacture methods  :  ERW method.

Payment Terms︰ T/T,L/C,etc

Product Image